Mobile Launcher Move for Hurricane Preparations
2019 · NASA · 67 seconds · 10 shots · Colour
Every shot in Mobile Launcher Move for Hurricane Preparations (2019), from NASA's Image and Video Library, with what's on screen and the exact seconds it starts and ends. Each shot was described from its own frames, so you can find the moment you need without scrubbing through the reel.
To use one, add Find Any Footage to Claude and ask for it by number, for example “get me a clip of shot 736”. You get a trimmed MP4 of just those seconds, cut from the archive's best copy, with the credit line.
Add to Claude for freeEvery shot, with timecodes

NASA title card with video details and date August 30 2019.
0:00.0–0:10.0 (10.0 s) · shot 735

Black screen with no visible objects.
0:10.0–0:12.1 (2.1 s) · shot 736

Wide shot of the mobile launcher on crawlerway moving slowly.
0:12.1–0:17.4 (5.3 s) · shot 737

Medium close-up of the mobile launcher base moving along the crawlerway.
0:17.4–0:23.8 (6.4 s) · shot 738

Medium shot of mobile launcher rounding a turn on the crawlerway.
0:23.8–0:30.3 (6.5 s) · shot 739

Close-up of crawler treads moving along gravel road with VAB in background.
0:30.3–0:38.9 (8.7 s) · shot 740

Medium shot of crawler-transporter moving toward camera on gravel roadway.
0:38.9–0:45.1 (6.1 s) · shot 741

Close-up of the crawler transporter tracks with workers standing nearby.
0:45.1–0:52.1 (7.0 s) · shot 742

Medium shot of the mobile launcher base approaching the camera path.
0:52.1–0:59.4 (7.3 s) · shot 743

Wide shot of mobile launcher moving down the crawlerway road.
0:59.4–1:06.9 (7.5 s) · shot 744
More from NASA
- NASA Continues Test Series for Redesigned Artemis Moon Rocket Engines · 2023 · 24 shots
- NASA’s X-59 Quiet Supersonic Aircraft Begins Taxi Tests Broll · 2025 · 10 shots
- X-59 Second Flight B-Roll · 2026 · 14 shots
- Orion's Preparations for Artemis II · 2025 · 57 shots
- U.S. Spacewalk 95 Animation – March 17, 2026 · 2026 · 43 shots
- Apollo Digest Series: Mission Control · 2021 · 69 shots